Intel is said to have placed an order for 3nm TSMC chips for Meteor Lake graphics tiles.

Spread the love

Meteor Lake will bring together numerous process nodes.

Taiwanese news allegations Intel has requested 3nm chips from Taiwan Semiconductor Manufacturing Company (TSMC) for its future Meteor Lake processors. If this is correct, it adds to the multiple node operations Meteor Lake will provide in its new “tiled” design.

Taiwan news outlet Commercial Times claims that the graphics processing hardware in the Meteor Lake CPUs will be TSMC 3nm chips. Industry insiders say TSMC will start producing them before the end of 2022. East Asia-based financial analyst Dan Nystedt noted Intel plans to package them with compute tiles of its own design for Meteor Lake processors.

Intel’s 14th-generation Core processors (Meteor Lake) are supposed to launch in 2023. The 12th-generation Alder Lake CPUs just recently made their debut, and the 13th generation Raptor Lakes are supposed to land sometime next year.

READ ALSO:  Denon finally announces its first true wireless earbuds

Meteor Lake will separate its various components—graphics, I/O, and compute—into separate chiplets, which Intel terms “tiles” in a new packaging method called Foveros. Each will use a different node process. The compute tiles will use Intel’s 7nm “Intel 4” process. Commercial Times says the I/O tiles will use either TSMC’s N5 or its N4 process, while the GPU tiles will use a 3nm process.

Last week, CNET photographed one of these tiles on one of Intel’s Meteor Lake test processors. These will be Intel’s first 7nm processors. Competitor AMD’s latest Zen3 CPUs already use TSMC’s 7nm process, though the 10nm Alder Lakes already perform favorably against them in benchmarks.

Image credit: Stephen Shankland

 103 

Leave a Reply